Kamran Israfilov

Your choice for any project
in world standards Tekno Pool

OTHER PROJECTS



LOCATION : Azerbaycan

PROJECT NAME : House SPA Center
PROJECT LOCATION : Azerbaycan 
PROJECT OWNER : Kamran Israfilov 
PROJECT SCOEP : Turn-key SPA pool
PROJECT START DATE : 2012
COMPLETION DATE     : 2012
PROJECT DURATION
PROJECT DETAILS

SWIMMING POOL 
1.40 m depth, 27 m², 38 m³ overflow pool installation 
Filtration installation,
Mechanic – electric installation,
Lighting.

SAUNA
6 m² turn-key sauna,
Stove and digital control unit,
Decorative stone coating behind the stove,
Lighting,
Woode nishes. 
 
STEAM ROOM
4,62 m² turn-key steam room,
Lux steam generation unit,
Stainless steel generation tank,
Resistance,
Water level control unit,
Safety valve and automatic shut-off,
High temperature thermostat,
Automatic tank bluff,
External thermocouple,
Silent steam production,
Digital control unit,
Settable heat between 50-110 °C
Digital heat and time shower,
Sensitive temperature and time setting with touch digital keys,
0-24 hours time and temperature programming,
Illumination control key,
Programming over 1, 3, 12 and 24 hours,
Energy saving feature with stand-by,
Digital clock,






Home / Projects /