Your choice for any project
in world standards Tekno Pool
PROjECT NAME: SPA Pool, Sauna, Steam and Bath Project
PROJECT LOCATION: Malatya, Turkey
PROJECT OWNER: Şampiyon Sports Club
PROJECT SCOPE: Swimming Pool, Turkish Bath, Sauna and Steam Bath Installation
PROJECT START DATE: 30.10.2010
PROJECT FINISH DATE: 20.02.2011
PROJECT DURATION: 130 Days
PROJECT DETAILS:
- 5 x 18m length, 1.5m depth adults’ swimming pool installation,
- Diameter 3 m children’s swimming pool installation,
- 2.5 x 3 m sauna installation,
- 2 x 3.5 m steam installation,
- 8 x 12 x 2.3 m bath installation,
- 20 ton / day single smoothing,
- 5 x 5 porcelain coating of children’s swimming pool and 12 x 25 porcelain coating of adults’ swimming pool,
- Automatic steam flavor dosing system.