NAME OF PROJECT: Öz-Su Social Facilities Swimming Pool Refurbishment
PLACE OF PROJECT: Karasu, Adapazarı, SAKARYA
OWNER OF PROJECT: Adapazarı Municipality
CONTENT OF PROJECT: Rehabilitation of Present Swimming Pool Filtration System
BEGINNING OF PROJECT: 25.5.2007
DATE OR COMPLETION OF PROJECT: 01.6.2007
DURATION OF PROJEC: 7 days
DETAILS OF PROJECT:
- Addition of 70 m³ capacity filtration system
- Installation of automatic chemical dosage system
- Renewal of electrical system
- Mounting of coloured pool lightening
- Production of engine room and equilibrium storage steel door