PROJECT NAME : Olympic Complex Phase III
PROJECT LOCATION : Ashgabat, Turkmenistan
PROJECT OWNER : Polimeks İnşaat
PROJECT SCOPE : Ornamental Pools Filtration Systems, Water Games and
Lighting Systems
PROJECT START DATE : 25.06.2016
PROJECT COMPLETION DATE : 01.03.2017
PROJECT TIME : 315 days
PROJECT DETAIL :
OLYMPIC COMPLEX STADIUM ORNAMENTAL POOLS 1 - 2
1.0 m deep, 335 m² cascade ornamental pool, filtration system, nozzles and lighting systems
Stadium Pool 1 and Stadium Pool 2 are the same size and have the same design.
- Pool filtration system,
- External overflow system,
- Bubbler nozzles that can throw water to a height of 6 m & width 3 m and nozzles lighting that changes color,
- Knee source nozzles and color changing nozzles lighting on the collector at certain intervals,
- Cascade water overflow system with submersible pumps,
- Color changing ledline lighting for cascades
- Full Automated filtration system and controlled by BMS
- Full automated fountain system and aotomatic adjusting with wind speed. Additionally controlled and tracing by BMS
- Synchronized pool LED lighting with building exterior and landscape LED lighting
OLYMPIC COMPLEX STADIUM ORNAMENTAL POOLS 3 - 4
1.0 m deep, 845 m² cascade ornamental pool, filtration system, nozzles and lighting systems
Stadium Pool 3 and Stadium Pool 4 are the same dimensions and designs are the same.
- Pool filtration system,
- External overflow system,
- Bubbler nozzles that can throw water to a height of 6 m & width 3 m and nozzles lighting that changes color,
- Knee source nozzle and color changing nozzles lighting on the collector at certain intervals,
- Cascade water overflow system with submersible pumps,
- Color changing ledline lighting for cascades
- Full Automated filtration system and controlled by BMS
- Full automated fountain system and aotomatic adjusting with wind speed. Additionally controlled and tracing by BMS
- Synchronized pool LED lighting with building exterior and landscape LED lighting