PROJECT NAME : Endless Pool Project
PROJECT LOCATION : Bodrum, Muğla, TURKEY
PROJECT OWNER : Polimeks Construction
PROJECT SCOEP : Swimming pool filtration and ligting system
PROJECT SCOEP :23.06.2015
COMPLETION DATE : 12.08.2015
PROJECT DURATION : 44 Days
PROJECT DETAILS :
ENDLESS SWIMMING POOL
• 1.40 m depth, 102 m², 143 m³ overflow endless swimming pool installation
• Pool filtration system installation,
• Led spot light,
• Water heating system,
• Automatic dosage system,
• Led spot light for pool stairs,
• Flexible led light for pool falling channel,
• Stainless steel stairs holding arm.