EXTRAS : Hydrotherapy Pool filtration and lighting system
LOCATION : Türkmenistan

PROJECT NAME : Hydrotherapy Pool Project
PROJECT LOCATION : Ashgabat / TURKMENISTAN
PROJECT OWNER : Polimeks Construction
PROJECT SCOEP : Hydrotherapy Pool filtration and lighting system 
PROJECT START DATE : 10.09.20122222
COMPLETION DATE     : 25.10.2012
PROJECT DURATION : 45 Days
PROJECT DETAILS

HYDROTHERAPY POOL 
1,40 m depth, 56 m², 78 m³ overflow hydrotherapy swimming pool installation, 
Filtration system installation,
Mechanic – electric installation,
Pool lighting,
Water heating system,
Automatic chemical dosage unit,
Stainless steel pool ladder. 
Special design stainless steel ladder,
Stainless steel wall grip.