PROJECT NAME : Hydrotherapy Pool Project
PROJECT LOCATION : Ashgabat / TURKMENISTAN
PROJECT OWNER : Polimeks Construction
PROJECT SCOEP : Hydrotherapy Pool filtration and lighting system
PROJECT START DATE : 10.09.20122222
COMPLETION DATE : 25.10.2012
PROJECT DURATION : 45 Days
PROJECT DETAILS :
HYDROTHERAPY POOL
1,40 m depth, 56 m², 78 m³ overflow hydrotherapy swimming pool installation,
• Filtration system installation,
• Mechanic – electric installation,
• Pool lighting,
• Water heating system,
• Automatic chemical dosage unit,
• Stainless steel pool ladder.
• Special design stainless steel ladder,
• Stainless steel wall grip.