LOCATION : Kocaeli

PROJECT NAME : Villa Swimming Pool    
PROJECT LOCATION : Basiskelei Kocaeli, TÜRKİYE 
PROJECT OWNER : Kutlu Insaat Pasadag Sites
PROJECT SCOEP : Adult and kids swimming pool 
PROJECT START DATE : 10.05.2011
COMPLETION DATE    : 25.06.2011
PROJECT DURATION : 45 days
PROJECT DETAILS


- 8.9 x 19 x 1.5 m, 169 m² ve 235 m³ internal suction (skimmer) adult pool, 3 x 5 x 0.5 m. 15 m² and 7 m³ children's pool of inside the liner coating
- Pool mechanical-electrical hardware installations
- Sand filtration system
- Fully automatic chemical dosing system
- Fully automatic pool cleaning robot