LOCATION : Malatya
PROJECT NAME: Indoor Swimming Pool
PROJECT LOCATION: Malatya, TURKEY
PROJECT OWNER: Science College
PROJECT SCOPE: Owerflow Swimming Pool
PROJECT START DATE: 15.01.2009
COMPLETION DATE: 30.01.2009
PROJECT DURATION: 15 days
PROJECT DETAILS:
- 7 x 15 x 1.9 m, 105 m² and 200 m³ capaticy owerflow adult swimming pool and 3 x 5 x 0.6 m, 15 m² and 9 m³ children's wimming pool 5 x 5 light blue porcelain inside coating and around the pool handle 25 x 25 cm porcelain cobalt coating manufacturing
- Lane separators for the adult pool