PROJECT NAME : Biological Swimming Pool
PROJECT LOCATION : Bodrum, Muğla
PROJECT OWNER : Erci Tarım
PROJECT SCOPE : Biological Swimming Pool and instrument Fountain Construction
PROJECT START DATE : 10.03.2022
PROJECT COMPLETION DATE : 19.06.2022
PROJECT TIME : 99 days
PROJECT DETAIL :
JACARANDA BIOLOGICAL SWIMMING POOL
Biological swimming pool 200 m2 area and 300 m3 water volume
• Biological swimming pool regeneration system
• Biological swimming pool regeneration area
• Bio culture
• Biological swimming pool water plants
• Biological swimming pool bio filtration system
• Fully automatic filter control system
• Water UV disinfection system
• Chemical stabilization units
• Anti-phosphate units
• Aerators
316 stainless steel accessories inside the pool (feding nozzles, grates,..ect)
316 Stainless steel Power LED mini and maxi spot wall lighting
Wooden pool ladder
POOL INSTRUMENT FOUNTAIN
Production of 2 trumpet fountains
• Brass trumpet fountain application and restoration
• Trumpet fountain water circulation system
• Fountain filtration system