LOCATION : İstanbul

NAME OF PROJECT: Villa Swimming Pool
PLACE OF PROJECT: Tuzla, ISTANBUL
OWNER OF PROJECT: Oya TERZİ
CONTENT OF PROJECT: Construction of Turn Key Overflow Porcelain Swimming Pool
BEGINNING OF PROJECT: Infrastructure: 08.11.2008/ Superstructure : 28.04.2009
DATE OR COMPLETION OF PROJECT: Infrastructure : 31.11.2008/ Superstructure : 06.06.2009
DURATION OF PROJECT: Infrastructure : 22 days/ Superstructure : 38 days
DETAILS OF PROJECT:

- Construction of 4 x 8 x 1.6 m, 32 m² and 53 m³ overflow porcelain covering swimming pool
- Construction of 1 x 1.5 x 2 m water storage tank
- Interior pool 5 x 5 cm light blue porcelain mosaic covering
- Interior pool 7 x 12.5 cobalt porcelain concave covering
- Sluiceway, equilibrium tank and 10 x 20 cm light blue porcelain covering for water storage tank
- Pool surrounding 12.5 x 25 skidproof cobalt porcelain handle
- Led lightening that changes colour itself
- Pool sand filtration system
- Water storage tank disk fitler system