PROJECT NAME : Water Fountain Project
PROJECT LOCATION : Ashgabat / TURKMENISTAN
PROJECT OWNER : Polimeks Construction
PROJECT SCOEP : Water fountain filtration and ligting system
PROJECT START DATE : 07.08.2014
COMPLETION DATE : 19.10.2014
PROJECT DURATION : 72 Days
PROJECT DETAILS :
WATER FOUNTAIN
Stair shaped water fountain
• Filtration system installation,
• Mechanic – electric installation,
• Water fountain overflow system,
• Water heating system,
• Automatic chemical dosage unit,
• Lighting.