PROJECT NAME : Rönesans MVD Project Steam Room
PROJECT LOCATION : Turkmenistan
PROJECT OWNER : Rönesans Conglomerate
PROJECT SCOEP : Steam Room
PROJECT START DATE : 2012
COMPLETION DATE : 2012
PROJECT DURATION :
PROJECT DETAILS :
STEAM ODASI MECHANICAL ELECTRICAL INSTALLATION
6.1 x 9.07 x 2.4 m, 42 m 2 and 115 m ᶾ steam room construction
• Luxury steam generation unit
• Stainless steel tanks generation
• Interchangeable corrosion resistant resistance
• Water level controller
• Safety valve and automatic shut – off
• High temperature thermostat
• Automatic tank bluff
• External thermocouple
• Gradual operation
• Silent steam production
• Luxury digital control panel
• Settable between 50-110 ° C
• Digital temperature and time indication
• Precise temperature and time setting with touch digital keys
• 0-24 hours time and temperature programming
• Touch light control key
• Programming over 1, 3, 12 and 24 hours
• Energy saving feature with stand-by
• Digital clock
• Water treatment and softening group
• Eucalyptus steam bath smell
STEAM ODASI MECHANICAL ELECTRICAL INSTALLATION
4.8 x 6.1 x 2.4 m, 29 m² and 70 m ᶾ steam room construction
• Luxury steam generation unit
• Stainless steel tanks generation
• Interchangeable corrosion resistant resistance
• Water level controller
• Safety valve and automatic shut – off
• High temperature thermostat
• Automatic tank bluff
• External thermocouple
• Gradual operation
• Silent steam production
• Luxury digital control panel
• Settable between 50-110 ° C
• Digital temperature and time indication
• Precise temperature and time setting with touch digital keys
• 0-24 hours time and temperature programming
• Touch light control key
• Programming over 1, 3, 12 and 24 hours
• Energy saving feature with stand-by
• Digital clock
• Water treatment and softening group
• Eucalyptus steam bath smell