EXTRAS : Air Bed Hidro Massage System
LOCATION : Malatya
PROJECT NAME: House Swimming Pool
PROJECT LOCATION: Malatya, TURKEY
PROJECT OWNER: Ahmet Türker
PROJECT SCOPE: Overflow Swimming Pool
PROJECT START DATE: 30.08.2010
COMPLETION DATE: 30.09.2010
PROJECT DURATION: 30 gün
PROJECT DETAILS:
- Construciton of 5 x 10 x 1.50m 50 m², 75 m³ water overflow swimming pool plaster and screed of pool inside,
- 5 x 5 cobalt porcelain coating of pool inside,
- 25 x 25 petit carre porcelain handles coating
- Mechanic – electrical installment,
- 25 m³/h sand filtration system,
- LED lightning,
- Air bed hidro massage system,
- The trampoline,
- Cover for mechanic room and balance tank,
- Ladder.