LOCATION : Malatya

PROJECT NAME : Social Club Swimming Pool Project  
PROJECT LOCATION :  Malatya, Turkey
PROJECT OWNER : Akranlar İnşaat
PROJECT SCOEP : Overflow Kid Swimming Pool Installation
PROJECT START DATE : 25.07.2011
COMPLETION DATE    : 17.10.2011
PROJECT DURATION :   82 Days
PROJECT DETAILS

- 7 x 14 x 0.60 m overflow swimming pool installation isolation, plaster and alum.
- 5 x 5 porcelain mosaic,
- 5 x 5 dolphin pattern of porcelain,
- 12.5 x 25 porcelain handle and non-slip coating,
- 12.5 x 25 Anti-slip coating porcelain staircase,
- 25m³/h sand filtration system,
- Automatic chemical dosing system,
- Poolside stainless shower system,
- LED color changing lighting,