EXTRAS : Residential Steam Therapy
LOCATION : Türkmenistan
PROJECT NAME: Residential Steam Therapy
PROJECT LOCATION: Archman, TURKMENISTAN (Archman, Turkmenistan Respublikasy)
PROJECT OWNER: Polimeks Construction Inc. (Turkmenistan Presidential)
PROJECT SCOPE: Arcidi bearing Cabinet Minister Turkish Bath Steam Generation Residential Construction
PROJECT START DATE: 18/11/2009
PROJECT COMPLETION DATE: 21/11/2009
PROJECT DURATION: 3 Days
PROJECT DETAILS:
• 3 x 9 1st class KW steam generation unit
- Stainless steel generation tank
- Replaceable corrosion resistant resistance
- Water level controller
- Safety valve and automatic shut-off
- High temperature thermostat
- Automatic tank blowdown
- External termokpul
- Gradually work
- Silent steam production
• Exclusive digital control panel
- Ability to set 25-50 °C
- Mode, with digital display and touch sensitive keys
- Time and temperature programming
- Touch lighting control
- 1, 3, 12 and 24 hours of programming over
- Different temperature program for each day
- Energy-saving feature
- Digital clock
- The program will not be lost even if the power is set to the non-volatile memory feature
• Inox smell dosing unit for aroma therapy
• Exclusive digital control panel for flavor dosage control
• Eucalyptus, menthol, cedar, lemon, exotic aroma steam bath Frutti
• Generation, water supply pre-filter group
• 750 liters / day capacity water purification and softening group for generation of water supply
• Electrical control panel
• Bronze finish with special steam nozzle