PROJECT NAME : Swimming Pool
PROJECT LOCATION : Rize
PROJECT OWNER : Berkan Construction Limited Company
PROJECT SCOEP : Panel Lineer Swimming Pool
PROJECT SCOEP :05.07.2018
COMPLETION DATE :08.07.2018
PROJECT DURATION :3 days
PROJECT DETAILS :
PANEL LINEER SWIMMING POOL
Swimming Pool For Adults: Skimmer system panel lineer swimming pool with a dimension of 4.20x8.20 m, a depth of 1.20 m, an area of 34.50 m² and a volume of 41.30 m3.
Installation of ready-made modular steel pool wall panels
Blue color liner coating inside of the pool
Polyester ready filtration cabinet
Pool filtration system installation
Pool mechanical - electrical system installation
Swimming pool automatic chemical disinfection control and dosage unit
AISI 316 stainless steel pool ladder