PROJECT NAME : Kazan Palace Tibet Water Fall
PROJECT LOCATION : Kazan, Tataristan / Russia
PROJECT OWNER : Polistroy Capital
SCOPE OF THE PROJECT : Asia Asia Restaurant Tibet Water Fall
PROJECT START DATE : 01.03.2019
COMPLETION DATE : 20.04.2019
PROJECT TIME : 50 days
PROJECT DETAIL:
KAZAN PALACE WATER FALL
Waterfall pool with an area of 4.3 m²
- Tibetian figures
- System water purifying cartridge micro filter
- 316 quality stainless steel body pumps
- Multifunctional pump drive system with progressive start and flow.
- 304 quality stainless steel feeding, overflow and discharge mouths inside the pool
- Automatic balance tank filling system