PROJECT NAME : Hotel Swimming Pool Project
PROJECT LOCATION : Sivas, Turkey
PROJECT OWNER : Niyazi ÜNER – BURUCIYE HOTEL
PROJECT SCOEP : Indoor Swimming Pool Installation
PROJECT START DATE : 06.06.2011
COMPLETION DATE : 28.06.2011
PROJECT DURATION : 22 Days
PROJECT DETAILS :
- 5 x 10 m measurement, 1.50 m depth, 24.50 m², 37 m³ overflow swimming pool installation,
- Isolation, plaster and alum,
- Mechanical electrical installation,
- 5 x 5 cm light blue/cobalt porcelain mosaic coating of pool inside,
- 12.5 x 25 cobalt porcelain handles and antislips,
- Pool water heating system,
- Pool inside jacuzzi system,
- LED lighting,
- Sand filtration system,
- Chemical dosage unit.