Varol Bicil

Your choice for any project
in world standards Tekno Pool

OTHER PROJECTS



EXTRAS : Aroma Therapy and Accessories
LOCATION : Diyarbakır

PROJECT NAME :  Villa Steam Room   
PROJECT LOCATION : Diyarbakir, TURKEY
PROJECT OWNER : Existing Saw
PROJECT SCOEP : Steam Room Manufacturing
PROJECT START DATE : 20/06/2009
COMPLETION DATE    : 23/06/2009
PROJECT DURATION :    3 Days
PROJECT DETAILS

• 2 x 3 x 2.2 m sizes, 13 m³  steam bath construction

• First Class steam generation unit
  - Stainless steel generation tank
  - Changeable resistance resistant to corrosion
  - Water level controller
  - Security valve and automatic shut-off
  - High temperature thermostat
  - Automatic tank bluff
  - External thermocouple
  - Fractional working
  - Soundless steam production

• Exclusive digital control panel
  - Setting between 25-50 °C
  - Digital indicator and touch-operated key sensible adjusting possibility
  - Time and temperature programming
  - Touch-operated lightening control
  - 1,3,12,24 hour programming
  - Different temperature programme for every day
  - Energy svfing feature
  - Digital timer
  - Ineffaceable memory feature even in electricity cut and  no setting programs lost

• Aroma Therapy and Accessories
  - Inox odour dosaging unit for Aroma therapy
  - Exclusive digital control panel for aroma dosage
  - Eucalyptus steam bath odour

• Water refining and softening group
• Ceiling artificial star sky LED lighting
• Color changing RGB LED lighting





Home / Projects /