PROJECT NAME : Villa Steam Room
PROJECT LOCATION : Diyarbakir, TURKEY
PROJECT OWNER : Existing Saw
PROJECT SCOEP : Steam Room Manufacturing
PROJECT START DATE : 20/06/2009
COMPLETION DATE : 23/06/2009
PROJECT DURATION : 3 Days
PROJECT DETAILS :
• 2 x 3 x 2.2 m sizes, 13 m³ steam bath construction
• First Class steam generation unit
- Stainless steel generation tank
- Changeable resistance resistant to corrosion
- Water level controller
- Security valve and automatic shut-off
- High temperature thermostat
- Automatic tank bluff
- External thermocouple
- Fractional working
- Soundless steam production
• Exclusive digital control panel
- Setting between 25-50 °C
- Digital indicator and touch-operated key sensible adjusting possibility
- Time and temperature programming
- Touch-operated lightening control
- 1,3,12,24 hour programming
- Different temperature programme for every day
- Energy svfing feature
- Digital timer
- Ineffaceable memory feature even in electricity cut and no setting programs lost
• Aroma Therapy and Accessories
- Inox odour dosaging unit for Aroma therapy
- Exclusive digital control panel for aroma dosage
- Eucalyptus steam bath odour
• Water refining and softening group
• Ceiling artificial star sky LED lighting
• Color changing RGB LED lighting