Adıyaman Municipality

Your choice for any project
in world standards Tekno Pool

OTHER PROJECTS



LOCATION : Adıyaman

PROJECT NAME : Aquapark Project
PROJECT LOCATION : Adıyaman, Turkey
PROJECT OWNER : Municipality of Adıyaman - ADIYAMAN
PROJECT SCOEP : Kids Swimming Pool and Aquapark Installation
PROJECT START DATE : 25.04.2011
COMPLETION DATE    : 15.06.2011
PROJECT DURATION :   50 Days
PROJECT DETAILS

- 12,50 x 25,00 m measurement and 0,80 m depth kids swimming pool, manufacturing of reinforced concrete infrastructure,
- 7,00 x 7,00 m measurement, 1,00 m depth kids splash pool, manufacturing of reinforced concrete infrastructure,
- Swimming pool lighting,
- Mushroom waterfall,
- Rabbit slide group,
- Little elephant slide group,
- Animation of dolphin fountain,
- Body slide group,
- Wide Slide group,
- Sand filtration system,
- Circulation pump with prefilter,
- Automatic sand clorinator,
- Dıgıtal chemical dosage system,
- İsolation, plaster and alum,
- 12,5 x 24,5 porcelain coating of pool inside,
- 25 x 25 m porcelain handles,
- 25 x 25 porcelain antislips around the pool,
- Mechanical electrical installations.





Home / Projects /