LOCATION : Malatya

PROJECT NAME: Aquapark Project
PROJECT LOCATION: Malatya, Turkey
PROJECT OWNER: Maraton Aquapark
PROJECT SCOPE: Turn-Key Water Slides Installation
PROJECT START DATE: 03.06.2010
COMPLETION DATE: 13.06.2010
PROJECT DURATION: 10 Days
PROJECT DETAILS:

- 9 x 9 m measurement, 1.2 m depth, 81 m², 97,2 m³ splash pool mechanical and electrical installations,
- 20 m wide slide
- 55 m body slide
- Side tower and ladder
- Slide water feed groups