Sistem Construction

Your choice for any project
in world standards Tekno Pool

OTHER PROJECTS



LOCATION : Kazakistan

PROJECT NAME : Sheikh Khalifa Houbara Breeding Centre GYM Swimming Pool                   
PROJECT LOCATION :  Chimkent, Kazakhistan             
PROJECT OWNER : System Construction            
PROJECT SCOEP : Indoor Swimming Pool, Foot Pool and Shower               
PROJECT SCOEP :2018
COMPLETION DATE : 2019    
PROJECT DURATION :4 months  
PROJECT DETAILS :


GYM INDOOR SWIMMING POOL and FOOTBATH 

Swimming Pool: Overflow system swimming pool with a dimension of 6.00x12.00 m,  a depth of1.40 m, an area of 72 m² and a volume of 100.80 m3.
Footbath: Overflow system footbath with a dimension of 1.75x1.85 m, a depth of 5 cm.
Pool, balance tank, technical room, foot bath and pool shower plaster & screed and insulation installation
2.5x2.5 cm harmony porcelain coating inside of the pool
Porcelain handles around the pool 
Porcelain non-slip coating on terrace
2.5x2.5 cm harmony porcelain coating for foot bath and shower
Epoxy-based joint application for all coatings
Swimming pool and foot bath filtration system installation
AFM glass filter element
Pool mechanical - electrical system installation
Swimming pool automatic chemical disinfection control and dosage unit
Foot bath chemical dosing unit
AISI 316 stainless steel pool ladder and pool ladder with stainless steel handle
AISI 316 quality stainless steel framed, daylight color 36W Power LED spotlight for pool wall
8W power led mini lights for stairs
AISI 316 quality stainless steel swimming pool accessories
Pool water heating system (plate heat exchanger)
Pool water heating system automation 
Pool shower area mosaic applications






Home / Projects /