LOCATION : Malatya

PROJECT NAME : University Swimming Pool   
PROJECT LOCATION : Malatya, TÜRKİYE
PROJECT OWNER : Inonu University
PROJECT SCOEP : Overflow Semi Olympic Swimming Pool and traning pool constraction
PROJECT START DATE : 14.04.2011
COMPLETION DATE    : 15.06.2011
PROJECT DURATION :   61 days
PROJECT DETAILS


- 16 x 24 x 2.4 m, 384 m² and 921 m³ overflow oliympic swimming pool and 6.10 x 16.10 x 1.3 m, 98.20 m² and 127.70 m³ owerflow training pool of 12.5 x 25 cm light blue and cobalt porcelain coating
- 33 x 33 cm Olympic pool cobalt porcelain handle and non-slip porcelain coating
- Mechanical-electrical hardware
- Sand filtration system
- Fully automatic chemical dosing system
- Pool water heating system
- Olympic competition equipments