PROJECT NAME : Olympic Complex Phase I
PROJECT LOCATION : Ashgabat, Turkmenistan
PROJECT OWNER : Polimeks Construction
PROJECT SCOEP : Fountain pools filtration systems, water games and lighting systems
PROJECT START DATE : 16.09.2013
COMPLETION DATE : 10.10.2014
PROJECT DURATION : 389 days
PROJECT DETAILS :
OLYMPIC COMPLEX POOL 1A
1.0 m in depth, 117 m² fountain pool, fountain and lighting systems
• Bubbler sprinkler that can throw water up to 6 m height and color changing fountain lighting,
• Source fountains and fountain lighting that changes color,
• 22 m wide, 2 m high waterfall system,
• Waterfall system flexible color changing ledline lighting,
OLYMPIC COMPLEX POOL 1B
1.00 m depth, 307 m² fountain pool, fountain and lighting systems
• Bubbler sprinkler that can throw water up to 6 m height and color changing fountain lighting,
• 12 m high water jets that can throw water and color changing fountain lighting,
• L: 5 m height, H: 3 m high intersecting and opening bird wing system and lighting,
• 3 and 6 meters high source fountain and color changing fountain lighting,
• 27 m wide, 2 meter high waterfall system,
• Waterfall system flexible color changing ledline lighting,
OLYMPIC COMPLEX POOL 2A-2B
1.0 m depth, 672 m² mascot ornamental pond, fountain and lighting systems
• Bubbler sprinkler that can throw water up to 6 m height and color changing fountain lighting,
• 3 and 6 meters high source fountain and color changing fountain lighting,
Color changing LEDline lighting for cascades,
OLYMPIC COMPLEX POOL 3A-3B
1.0 m depth, 436 m² cascading fountain, fountain and lighting systems
• Bubbler sprinkler that can throw water up to 6 m height and color changing fountain lighting,
• L: 5 m height, H: 3 m high intersecting and opening bird wing system and lighting,
• 3 meter high source fountain and color changing fountain lighting,
• Waterfall system flexible color changing ledline lighting,
Color changing LEDline lighting for cascades,