EXTRAS : 300 W/12 V Lightning
LOCATION : Şanlıurfa
PROjECT NAME: Villa Swimming Pool Project
PROJECT LOCATION: Şanlıurfa, Turkey
PROJECT OWNER: Dr. Turgay Yüksel
PROJECT SCOPE: Overflow Swimming Pool Installation
PROJECT START DATE: 10.03.2010
PROJECT FINISH DATE: 25.04.2010
PROJECT DURATION: 45 Days
PROJECT DETAILS:
- 6 x 12 x 1.6 m, 72 m², 115 ³ Overflow Swimming Pool
- Pool mechanical&electrical installation
- Pool cleaning robot which can climb to wall
- 300 W/12 V lightning
- Automatic chemical dosing system