EXTRAS : Automatic Chemical Dosage System
LOCATION : Malatya
PROJECT NAME: Villa Swimming Pool Project
PROJECT LOCATION: Malatya, Turkey
PROJECT OWNER: Erol Aral
PROJECT SCOPE: Turn-key Swimming pool and pool jacuzzi installation
PROJECT START DATE: 26.07.2010
COMPLETION DATE: 21.10.2010
PROJECT DURATION: 85 Days
PROJECT DETAILS:
- 6 x 12 m measurement, 1.4 – 1.8 m double depth 72 m², 118.8 m³ overflow swimming pool installation
- Pool inside jacuzzi installation
- 5 x 5 cm light blue porcelain mosaic coating of pool inside
- 12.5 x 25 cm cobalt porcelain handle coating of pool around
- Sand filtration system
- Mechanical – electric installation
- Underwater lighting
- Hydrotherapy whirlpool in the pool
- Automatic chemical dosage system