Polimeks Construction

Your choice for any project
in world standards Tekno Pool

OTHER PROJECTS



LOCATION : Türkmenistan

PROJECT NAME : Awaza Rehabilitation Center                     
PROJECT LOCATION : Awaza, Turkmenistan             
PROJECT OWNER : Polimeks Construction               
PROJECT SCOEP : Therapy Pool and Thermal Pool              
PROJECT SCOEP : 2017
COMPLETION DATE :2018     
PROJECT DURATION
PROJECT DETAILS :


AWAZA REHABILITATION CENTER SEA WATER SWIMMING POOL 

Overflow system adult swimming pool (sea water) with a dimension of 12.5x25.00 m, a depth of 1.40 m, an area of 314 m2 and a volume of 440.00 m3.
Overflow system children swimming pool (sea water) with a dimensions of 5.30x8.50 m, a depth of 0.50 m, an area of 35 m2 area and a volume of 17.50 m3.
DIN norm slow filtration system suitable for sea water 
AFM glass filter media
Pool mechanical - electrical system installation
Fully automatic touch screen controlled filtration system installation
Fully automatic touch screen controlled technical equipment monitoring system installation
Pool automatic chemical dosing system
Sand-sludge separator for seawater, pre-filtration and automation system
AISI 316 stainless steel pump system and automation for water supply from the sea
AISI 316 quality stainless pool ladder, stainless stair handle, seat bar
AISI 316 quality stainless railing for children's pool
36 W Power LED spot lighting for pool walls
8 W Power LED mini spot lighting for pool stairs 
Technical room water level warning system

AWAZA REHABILITATION CENTER WATER FOUNTAIN

WAter fountain with a dimension of 3.30x7.00 m, a depth of 0.90 m with cascade and fountains. 
Tekno 150T cascade fountain sprinkler located according to pool form, 15 pcs
Submersible type stainless steel sprinkler pump located inside the pool, 3 pcs
Stainless steel sprinkler collector group 
36 W Power LED RGB fountain lighting






Home / Projects /