LOCATION : Tekirdağ

PROJECT NAME : Villa Swimming Pool      
PROJECT LOCATION : Saray, TEKİRDAĞ, TÜRKİYE
PROJECT OWNER : Yakup Şahintürk
PROJECT SCOEP : Overflow Swimming Pool and Pool Terrace constraction
PROJECT START DATE : 21.04.2011
COMPLETION DATE    : 15.06.2011
PROJECT DURATION :   54 days
PROJECT DETAILS


- 5 x 10 x 1.5 m, 50 m² and 75 m³ of reinforced concrete bottom of the overflow swimming pool construction
- 70 m² terrace with swimming pool around the bottom of reinforced concrete constructions
- 5 x 5 cm light blue porcelain coating inside of Pool
- The pool area and terrace, 25 x 25 cm non-slip cobalt blue porcelain coating
- Pool-made mechanical-electrical installations
- Sand filtration system
- Fully automatic filtration control system
- Fully automatic chemical dosing system
- Fully automated ozone disinfection system
- Fully automatic pool cleaning robot