PROJECT NAME : Hotel Swimming Pool
PROJECT LOCATION : Kazan, Tataristan, Rusia
PROJECT OWNER : Polistroy Kapital Construction
PROJECT SCOEP : Hotel Swimming Pool
PROJECT START DATE : 20.05.2017
COMPLETION DATE : 03.09.2018
PROJECT DURATION : 121 days
PROJECT DETAILS :
KAZAN PALACE SWIMMING POOL
Hidden overflow system swimming pool with a dimension of 7.30x15.60 m, a depth of 1.40 m, an area of 114 m² and a water volume of 160 m3 .
Pool plaster & screed and insulation installation
Mosaic coating inside of the pool
Transparent epoxy joint application
Pool filtration system installation
Slow filtration system with AFM glass media
Pool mechanical - electrical system installation
Production of chlorine disinfection from salt with full automatic salt-chlorine generator
Swimming pool automatic chemical disinfection control and dosage unit
Pool water heating system (plate heat exchanger)
Pool water heating system automation
Secret sluice production
AISI 316 stainless steel pool stair handrail, 16 pcs
AISI 316 stainless steel pool accessories inside the pool
Mini power LED lighting for poolside wall and staircase lighting, 105 pcs