PROJECT NAME : Awaza Rehabilitation Center
PROJECT LOCATION : Awaza, Turkmenistan
PROJECT OWNER : Polimeks Construction
PROJECT SCOEP : Therapy Pool and Thermal Pool
PROJECT SCOEP : 2017
COMPLETION DATE : 2018
PROJECT DURATION :
PROJECT DETAILS :
AWAZA REHABILITATION CENTER THERAPY POOL
Overflow system theraphy swimming pool with a dimension of 7.75x22.80 m, a depth of 1.40 m, an area of 177 m2 and a volume of 247.00 m3 .
DIN norm slow filtration system installation
AFM glass filter media
Pool filtration mechanical - electrical system installation
Pool massage system (back-calf air and water massage, foot air massage)
Massage system poolside automatic control units
In-room massage units mechanical - electrical system installation