PROJECT NAME : Bodrum Vogue Hotel Villa Shock Pool
PROJECT LOCATION : Bodrum, Muğla
PROJECT OWNER : Vogue Hotel
PROJECT SCOPE : Shock pool, Filtration Systems and Lighting Systems
PROJECT START DATE : 10.03.2020
PROJECT COMPLETION DATE : 25.03.2020
PROJECT TIME : 15 days
PROJECT DETAIL :
VILLA SHOCK POOL
Ø 2.1 m diameter, 1 m depth, 3.46 m2 area and 4.33 m3 volume, internal overflow circular shock pool
- Pre-filter pool circulation pump
- Polyester sand filter
- Pool water cooling system automation
- Power Led pool wall lighting system,
- Chiller water cooling system.