PROJECT NAME : Infinity Swimming Pool
PROJECT LOCATION : Bodrum, Muğla
PROJECT OWNER : Erci Tarım
PROJECT SCOPE : Convantional Infinity Pool Construction
PROJECT START DATE : 25.12.2020
PROJECT COMPLETION DATE : 03.04.2020
PROJECT TIME : 98 days
PROJECT DETAIL :
NATURAL POND AND CASCADED CREEK WITH FISH
Infinity flow system swimming pool with a dimension of 7x13.50 m, a single depth of 1.40, an area of 94.50 m² and a water volume of 143 m3
- Salty Water filtration system
- AFM filter glass media
- Fully automatic filtration control system
- Fully automatic salt-natural chlorine generator
- Fully automatic pool chemical control and dosage unit
- 316 stainless steel accessories inside the pool (feding nozzles, grates,..ect)
- 316 Stainless steel Power LED maxi spot wall lighting
- Wooden pool ladder