PROJECT NAME : Infinity Swimming Pool 
PROJECT LOCATION : Bodrum, Muğla
PROJECT OWNER    : Erci Tarım
PROJECT SCOPE : Convantional Infinity Pool Construction
PROJECT START DATE : 25.12.2020
PROJECT COMPLETION DATE : 03.04.2020
PROJECT TIME : 98 days
PROJECT DETAIL :

NATURAL POND AND CASCADED CREEK WITH FISH

Infinity flow system swimming pool with a dimension of 7x13.50 m, a single depth of 1.40, an area of 94.50 m² and a water volume of 143 m3

  • Salty Water filtration system
  • AFM filter glass media
  • Fully automatic filtration control system
  • Fully automatic salt-natural chlorine generator
  • Fully automatic pool chemical control and dosage unit
  • 316 stainless steel accessories inside the pool (feding nozzles, grates,..ect)
  • 316 Stainless steel Power LED maxi spot wall lighting
  • Wooden pool ladder