Sakarya University

Your choice for any project
in world standards Tekno Pool

OTHER PROJECTS



LOCATION : Sakarya

NAME OF PROJECT: Culture and Congress Center Ornamental Pool
PLACE OF PROJECT: Sakarya
OWNER OF PROJECT: Sakarya University (Ucuz Construction)   
CONTENT OF PROJECT: Construction of  Turn Key Ornamental Pool Mechanic- Electrical Installation
BEGINNING OF PROJECT: Infrastructure: 06.09.2008/ Superstructure :25.12.2009
DATE OR COMPLETION OF PROJECT: Infrastructure : 10.09.2008/ Superstructure :30.12.2009
DURATION OF PROJECT: Infrastructure : 4 days   / Superstructure: 5 days   
DETAILS OF PROJECT:

- 235 m² overflow ornamental pool mechanic-electrical installation
- Complete stainless steel cascade fountains
- Complete stainless steel bracelet type led lightening that changes colour
- 10 meter RGB led stick lightening with animation control panel
- 10 meter waterfall
- Sand filtration and cleaning





Home / Projects /