LOCATION : Adıyaman
NAME OF PROJECT: Social Facility Swimming Pool
PLACE OF PROJECT: ADIYAMAN
OWNER OF PROJECT: Turkish Petrol Anonmy Parnership Region Directorship
CONTENT OF PROJECT: Contruction of Turn Key Pannel-Liner Kid Swimming Pool
BEGINNING OF PROJECT: 20.03.2007
DATE OR COMPLETION OF PROJECT: 20.04.2007
DURATION OF PROJECT: 30 days
DETAILS OF PROJECT:
- Production of 3 x 4 m measurement, 0.8 depth swimming pool reinforced concrete infrastructure
- Side wall production with locked panel
- Mosaic ornamented interior covering
- Skimmer system installation mounting
- Sand filtration system ( filtration cycle duration : 1 hour/all pool water )
- Pool surrounding 5 x 30 cm special cut travertine toe rail
- 1 m termowood covering of pool surrounding