PROJECT NAME : Embassy Of Saudi Arabia Pools
PROJECT LOCATION : Asgabat, Turkmenistan
PROJECT OWNER : Alazhari Contracting
PROJECT SCOEP : Indoor Swimming Pool and fountain
PROJECT SCOEP :30.04.2017
COMPLETION DATE :15.08.2017
PROJECT DURATION :105 days
PROJECT DETAILS :
EMBASSY OF SAUDI ARABIA SWIMMING POOL
Overflow system swimming pool with a dimension of 4.35x8.00 m, a double depth of 1.30 m - 1.90 m, an area of 35 m² and a water volume of 56 m3.
Pool filtration system installation
AFM glass filter media
Pool mechanical - electrical system ninstallation
Pool automatic chemical disinfection and dosing unit
Pool ozone disinfection system
AISI 316 quality stainless steel pool ladder
36W Power LED spot pool lighting
Pool water heating system (plate heat exchanger)
Pool water heating system automation
Supply and installation of 9.5 m3 capacity stainless steel modular tank
EMBASSY OF SAUDI ARABIA WATER FOUNTAIN
Water fountain with a diameter of R: 2.00 m, a depth of 0.35 m, 2 pcs
Water fountain with a diameter of R: 5.00 m, a depth of 0.35 m, 1 pcs
Tekno cascade fountain located at the middle of the fountain
Stainless steel sprinkler submersible pump located in pump pit
Stainless steel grill cover for pump housing
Power LED fountain lights
Led Line pool wall lights
LEDline lighting following the pool wall