LOCATION : Azerbaycan
NAME OF PROJECT: Baku Pik Land Playing Complex
PLACE OF PROJECT: Airport Way, Baku, Azerbaijan
OWNER OF PROJECT: AEC TEKNOlogy
CONTENT OF PROJECT: Swimming Pool, Play Pool, Ornamental Pool and Water Filtration System
BEGINNING OF PROJECT: 15.05.2007
DATE OR COMPLETION OF PROJECT: 30.07.2007
DURATION OF PROJECT: 45 days
DETAILS OF PROJECT:
- 250 m²/375 m³ swimming pool, mechanic-electrical installment
- 250 m²/150 m³ paddling and boat pool, mechanic-electrical installment
- 28 m² stainless steel ornamental pool with sphere fountain
- 50 m² water tank sand filtration system
- 178 x 185 x 297 cm triple clown shower
- 65 x 65 x 30 cm stainless steel water Curtain for swimming pool
- Slide mechanic-electrical installment