PROJECT NAME : Villa swimming pool
PROJECT LOCATION : Djibouti
PROJECT OWNER : Al-Gamil Company
SCOPE OF THE PROJECT : Pannel-Liner Swimming Pool
PROJECT INITIAL DATE : 30.05.2020
PROJECT COMPLETION DATE: 10.06.2020
PROJECT PERIOD : 11 days
PROJECT DETAILS :
DJIBOUTI PANNEL-LINER SKIMMER SYSTEM SWIMMING POOL
Swimming Pool For Adults: Skimmer system panel lineer swimming pool with a dimension of 4.20x8.20 m, a depth of 1.20 m, an area of 34.50 m² and a volume of 41.30 m3.
- Installation of ready-made modular steel pool wall panels
- Blue color liner coating inside of the pool
- Polyester ready filtration cabinet
- Pool filtration system installation
- Pool mechanical - electrical system installation
- Swimming pool automatic chemical disinfection control and dosage unit
- Ready-made Jacuzzi bench/ladder (Fiber/GRP, Glass Rainforced Polyester)