Turkmenistan Presidential

Your choice for any project
in world standards Tekno Pool

OTHER PROJECTS



EXTRAS : Residential Steam Therapy
LOCATION : Türkmenistan

PROJECT NAME: Residential Steam Therapy
PROJECT LOCATION: Turkmenbashi TURKMENISTAN (Ashgabat, Turkmenistan Respublikasy)
PROJECT OWNER: Polimeks Construction Inc. (Turkmenistan Presidential)
PROJECT SCOPE: Turkmenbashi Cabinet Minister Turkish Bath Steam Generation Making
PROJECT START DATE: 18/11/2009
PROJECT COMPLETION DATE: 21/11/2009
PROJECT DURATION: 3 Days
PROJECT DETAILS:

• 1st class 3 x 12 KW steam generation unit
  - Stainless steel generation tank
  - Replaceable corrosion resistant resistance
  - Water level controller
  - Safety valve and automatic shut-off
  - High temperature thermostat
  - Automatic tank blowdown
  - External termokpul
  - Gradually work
  - Silent steam production

• Exclusive digital control panel
  - Ability to set 25-50 °C
  - Mode, with digital display and touch sensitive keys
  - Time and temperature programming
  - Touch lighting control
  - 1, 3, 12 and 24 hours of programming over
  - Different temperature program for each day
  - Energy-saving feature
  - Digital clock
  - The program will not be lost even if the power is set to the non-volatile memory feature

• Inox smell dosing unit for aroma therapy
• Exclusive digital control panel for flavor dosage control
• Generation, water supply pre-filter group
• 750 liters / day capacity for the generation of water purification and softening group feed
• Eucalyptus, menthol, cedar, lemon, exotic aroma steam bath Frutti





Home / Projects /