Bereket Group

Your choice for any project
in world standards Tekno Pool

OTHER PROJECTS



LOCATION : Afganistan

PROJECT NAME : Residance Turkish Bath  
PROJECT LOCATION :  Mazar-i-sharif Afghanistan (مزارِ شریف, د افغانستان اسلامي جمهوریت - Jomhūrī-ye Eslāmī-ye Afġānistān)
PROJECT OWNER : Barakat Group
PROJECT SCOEP : Construction of  Turkish Bath and Steam Generation
PROJECT START DATE : 15.09.2011
COMPLETION DATE    : 22.09.2011
PROJECT DURATION :   14 days
PROJECT DETAILS

• Desing and 3D applications
• Installation of wall, bancking, gorund and warm Stone heating system
• Isolated of hamam inside
• Produced and installation of marble
• Produced and installation of hand made Turkish tile
• The brass ornament on Turkish tile
• Produced and installation of star desing warm stone
• Produced of dome ceiling with fiber optic led lighting
• Produced of around of dome ceiling led lighting
• Around of kurna parlement color led lighting
• Seljuk patterned special sekurit glass door
• 6 Kw 1.Class steam generation unit
        - Stainless steel generation tank
- Changeable resistance resistant to corrosion
- Water level controller
- Security valve and automatic shut-off
- High temperature thermostat
- Automatic tank bluff
- External thermocouple
- Fractional working
- Soundless steam production

• Exclusive digital control panel
- Setting between 25-50 °C
- Digital indicator and touch-operated key sensible adjusting possibility
- Time and temperature programming
- Touch-operated lightening control
- 1,3,12,24 hour programming
- Different temperature programme for every day
- Energy saving feature
- Digital timer
Ineffaceable memory feature even in electricity cut and  no setting programs lost

• Aroma Thyrapi and Accessories
- Odor dosaging unit for Aroma therapy
- Water refining and softening group for generation water feding
- Special vapor-plated bronze nozzles
- Eucalyptus, Menthol, Cedar, Lemon, Exotic frutti steam bath aroma





Home / Projects /