PROJECT NAME : Residence Swimming Pool and Fountain Project
PROJECT LOCATION : Osmaniye, Turkey
PROJECT OWNER : Pekerler Construction
PROJECT SCOEP : Turn-key indoor swimming pool installation
PROJECT START DATE : 30.11.2011
COMPLETION DATE : 30.12.2011
PROJECT DURATION : 30 Days
PROJECT DETAILS :
Indoor Swimming Pool:
• 10 x 20 m dimensions, 1.50 m depth, 200 m², 300 m³ overflow adults swimming pool installation,
• 2 x 4 m dimensions, 0,60 m depth, 8 m², 4,8 ³ overflow kids swimming pool installation,
• Swimming pool digital heating system,
• Digital chemical dosage unit,
• LED Lighting.
Indoor Fountain Pool:
• 0.70 x 4 m dimensions, 2.8 m², 1.68 m³ fountain pool
• Cascade fountain nozzle,
• RGB LED power lighting.
• Disc filtration system