LOCATION : Şanlıurfa
PROJECT NAME: Villa Swimming Pool
PROJECT LOCATION: Şanlıurfa, TURKEY
PROJECT OWNER: Olcay Derici
PROJECT SCOPE: Panel-Liner Swimming Pool Installation
PROJECT START DATE: 01.09.2009
COMPLETION DATE: 10.09.2009
PROJECT DURATION: 10 days
PROJECT DETAILS:
- Pool concrete infrastructure
- 5 x 10 m measurement, 1.50 m depth, 50 m² and 68 m³, panel-liner instant inground swimming pool installment
- Tile-patterned liner coating of inside pool
- Pool sand filtration system
- 300 W/12V halogen lighting