PROJECT NAME : Olympic Complex Phase I
PROJECT LOCATION : Ashgabat, Turkmenistan
PROJECT OWNER : Polimeks Construction
PROJECT SCOEP : Fountain pools filtration systems, water games and lighting systems
PROJECT START DATE : 15.03.2015
COMPLETION DATE : Continues
PROJECT DURATION :
PROJECT DETAILS :
OLYMPIC COMPLEX POOL 4
1.00 m depth, 514 m² cascade fountain pool, filtration system, fountain and lighting systems
• Pool filtration system,
• Pond hidden overflow system,
• Bubbler, which can throw water to 8 m, 5 m and 4 m high, and color changing fountain lighting,
• High jetting and color changing fountain lighting that can throw water up to 12 m high,
• 4 meters high source fountain and color changing fountain lighting,
• 49 meter length, 2 meter height waterfall system flexible color changing ledline lighting,
Color changing LEDline lighting for cascades,
OLYMPIC COMPLEX BEACH POOL 5 – 6
1.0 m depth, 1,517 m² cascade fountain pool, filtration system, fountain and lighting systems.
Square Pool 5 and Square Pool 6 are the same sizes and designs are the same.
• Pool filtration system,
• Pond hidden overflow system,
• Bubbler sprinkler that can throw water up to 6 m height and color changing fountain lighting,
4 meters high source fountain and color changing fountain lighting,
OLYMPIC COMPLEX SQUARE POOL 7 (MONUMENT FOUNTAIN POOL)
1.0 m depth, 1.517 m² cascade fountain pool, filtration system, fountain and lighting systems
• Pool filtration system,
• External overflow system,
• With the collector system, the source fountain and the color changing fountain lighting, which can throw water at altitudes ranging from 1.5 - 2.5 m,
• For submersible pump pit, special pattern cut lid with stainless grill,
• Ornamental pool wall spot lighting,
• Color changing LEDline lighting for cascades,