PROJECT NAME : Facilitiy Swimming Pool
PROJECT LOCATION : Kızıltepe, MARDİN
PROJECT OWNER : Kılıçlar Prestige Facilities, Şemsettin KILIÇ
PROJECT SCOEP : Turn Key Movable Pannel-Liner (Readymade) Swimming Pool
PROJECT START DATE : 04.04.2008
COMPLETION DATE : 23.04.2008
PROJECT DURATION : 19 days
PROJECT DETAILS :
- Construction of 10 x 20 m measurement, from 1.5 to 2.0 m depth, 200 m² and 357 m³ water volumed, outer movable type, general usage panel-liner swimming pool
- Construction of 2.5 x 4 m measurement, 0.6 depth, 10 m² and 5 m³ water volumed interior skimmer concrete –liner kid pool
- Construction of 3 x 4 m measurement, 1.5 m depth, 18 m³ water volumed, movable slide falling pool
- Panel construction resistant to earthquake with readymade locked panel
- Construction of readymade oval surfaced monoblock polyester sluice
- Turquoise coloured liner interior covering
- 112 m³/h capacity sand filtration system